Pool Construction



Pool Pix 047, originally uploaded by nalcott.

Here is a shot of the dry concrete. It’s been about 1.5 weeks since any major activity has taken place (mostly electrical work and inspections are going on).

Tomorrow (5/2/07) we are scheduled for “Pool Orientation” where they will fire up the pump and heater and teach us how to operate and maintain the pool.

Also, the retaining wall is scheduled to start tomorrow.

One Response to “Pool Construction”

  1. jtincher Says:

    cool! so when is the pool party?!

Leave a Reply