Once the concrete set and the inspector gave the OK, they backfilled.
This entry was posted
on Tuesday, May 1st, 2007 at 6:41 am and is filed under Pool Construction.
You can follow any responses to this entry through the RSS 2.0 feed.
You can leave a response, or trackback from your own site.